The Late Diving Superintendent Mike Fairfield carrying out his Toolbox Talk Prior to the mobilisation of the Air/Nitrox SDDE spread onto the DPII DSV Manta in Germany July 2004. for the Maersk OIl & Gas Annual Offshore Platform Inspection Programme.
Boat Landing section removed by divers from the Offshore Platform using diamond wire cutting in the Danish Sector of the North Sea. in June 2009.
Birds resting on the SBM located offshore in the Falkland Islands following its cleanup and annual maintenance programme.
The Blyth Offshore Wind Farm's Subsea Power Cable at it's Shore End Landing
DSV Manta standing by offshore alongside a fixed Production Platform in the Danish Sector of the North Sea in August 2004.
Gas Production Platform located offshore Denmark in the North Sea August 2006.
This images shows a visual crack located by divers in an offshore Platform weld complexe, crack stopper holes were drilled into the ends of the cracks as a temporary measure in the late 1970's
Divers recovering the old Aldeburgh long sea outfall in November 2000 the outfall head was located 1350m seaward from the beach with the divers working most of the time in nill visibility.
Working diver being deployed to depth over the side of the DPII DSV alongside a fixed offshore platform in the Danish sector of the North Sea.
The Penrod 85 Jack Up Rig Deploying it's Drilling Template onto the Seabed in Preparation for its Drilling Operations in the North Sea.
Burial of one of the 3 subsea power cables between the North Denes Beach Shore End and the Scroby Sands OWF. This image shows the subsea cable plough still on the beach and the power cable located inside the cable quadrant in preparation for the pull.
A section of subsea brace being recovered to the deck after being cut from an Offshore Platform by divers using diamond wire cutting procedures . The diamond wire has made a clean cut through the steel wall of the brace and the concrete fill.
The Recovery of an SBM from it location offshore Denmark in July 2004 for Planned Maintenance works onshore prior to its return to operations in the Danish sector.
Preparations underway at Herne Bay to accept the Subsea Power Cables from the Kentish Flats Offshore wind Farm in November 2004.